{"id":266,"date":"2026-09-11T10:20:43","date_gmt":"2026-09-11T07:20:43","guid":{"rendered":"https:\/\/zigguratbim.co.il\/blog\/how-to-prepare-a-project-for-bim-coordination\/"},"modified":"2026-10-20T15:11:57","modified_gmt":"2026-10-20T12:11:57","slug":"how-to-prepare-a-project-for-bim-coordination","status":"publish","type":"post","link":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/","title":{"rendered":"How to prepare a project for BIM coordination"},"content":{"rendered":"<div id=\"project-readiness\" class=\"article-section\">\n<p class=\"article-kicker\">01 \/ Readiness<\/p>\n<h2>Check the composition and readiness of disciplines<\/h2>\n<p>If architecture, structures, and engineering (MEP) systems use different coordinates, versions, or incomplete data, a large part of the first coordination cycle is spent not on finding engineering solutions, but on preparing information.<\/p>\n<p>Therefore, before starting <a class=\"article-link\" href=\"https:\/\/zigguratbim.co.il\/en\/services\/systems-coordination\/\">BIM-coordination<\/a>, it is worth conducting a short check of the readiness of the project. First, you need to determine which disciplines are already available: architecture, structures, heating, ventilation and air conditioning (HVAC), water and sanitation, electrical, fire and process systems.<\/p>\n<p>Models do not have to be 100% complete, but they should contain enough information for spatial analysis.<\/p>\n<div class=\"requirements-card\">\n<p class=\"requirements-card__title\">Data for initial evaluation<\/p>\n<ul class=\"article-checklist\">\n<li>area and number of floors; <\/li>\n<li>design stage; <\/li>\n<li>list of disciplines; <\/li>\n<li> RVT, IFC, DWG or other file formats; <\/li>\n<li>level of readiness of models; <\/li>\n<li>planned start of construction.<\/li>\n<\/ul>\n<\/div>\n<p class=\"article-note\">Ziggurat uses such data to determine the project&#8217;s readiness for the first coordination cycle.<\/p>\n<\/div>\n<div id=\"shared-coordinates\" class=\"article-section\">\n<p class=\"article-kicker\">02 \/ Coordinates<\/p>\n<h2>Agree on coordinates and relevance of models<\/h2>\n<p>One of the most common problems is different coordinate systems in consultants. Revit, IFC, and DWG coordinate systems, levels and elevations, units of measurement, datum points, and positioning rules must be agreed upon before merging models.<\/p>\n<p>It is equally important to determine which version of each model is current, who is responsible for it and how often it is updated. BIM coordination of legacy models actually creates additional work instead of reducing risks.<\/p>\n<blockquote class=\"article-quote\"><p>A single coordinate system and clear responsibility for versions is a basic condition for reliable interdisciplinary coordination.<\/p><\/blockquote>\n<\/div>\n<div id=\"exchange-rules\" class=\"article-section\">\n<p class=\"article-kicker\">03 \/ Exchange Rules<\/p>\n<h2>Define the rules before starting coordination<\/h2>\n<p>Before starting work, it is necessary to agree not only the composition of the models, but also the order of interaction between the project participants. This is where <a class=\"article-link\" href=\"https:\/\/zigguratbim.co.il\/en\/services\/bim-management\/\">BIM model management<\/a> turns a set of files into a controlled information process.<\/p>\n<div class=\"requirements-card\">\n<p class=\"requirements-card__title\">What needs to be agreed<\/p>\n<ul class=\"article-checklist\">\n<li>which disciplines are checked among themselves;<\/li>\n<li>who is responsible for correcting comments;<\/li>\n<li>how often models are updated;<\/li>\n<li>where current files are stored;<\/li>\n<li>how changes are transmitted;<\/li>\n<li>how coordination meetings are held.<\/li>\n<\/ul>\n<\/div>\n<p>For complex projects, these rules should be formalized in a BIM implementation plan (BEP) and use a common data environment (CDE) to control models and versions.<\/p>\n<\/div>\n<div id=\"first-cycle\" class=\"article-section article-section--before-feature\">\n<p class=\"article-kicker\">04 \/ First cycle<\/p>\n<h2>The prepared model is the beginning of real coordination<\/h2>\n<p>The prepared model allows the BIM team to focus on the main thing &#8211; interdisciplinary coordination. If the system detects that the pipe crosses the beam, this is not enough. You need to determine which system can be changed, whether maintenance access will remain, and whether the new solution will create another conflict.<\/p>\n<p>Therefore, the result <a class=\"article-link\" href=\"https:\/\/zigguratbim.co.il\/en\/services\/systems-coordination\/#coord-process-title\">of the coordination of engineering systems<\/a> should not be just a list of collisions, but an agreed engineering solution and a revalidated model.<\/p>\n<ol class=\"implementation-flow\" aria-label=\"First coordination cycle sequence\">\n<li><strong>Verification<\/strong>Input models and discipline readiness<\/li>\n<li><strong>Unification<\/strong>Coordinates, levels and current versions<\/li>\n<li><strong>Solution<\/strong>Technically correct elimination of conflicts<\/li>\n<li><strong>Recheck<\/strong>Updated and reconciled model<\/li>\n<\/ol>\n<\/div>\n<div id=\"ziggurat-experience\" class=\"article-section article-experience\">\n<div class=\"article-feature__heading\">\n<p class=\"article-kicker\">05 \/ Practice<\/p>\n<h2>Ziggurat Experience<\/h2>\n<\/div>\n<div class=\"article-feature__copy\">\n<p>Ziggurat checks the available models, the readiness of the disciplines responsible for updating them, the regularity of transfer of changes and factors that can block coordination.<\/p>\n<p>This approach allows you to move to the real coordination of systems faster and not spend the first cycles on correcting basic data problems.<\/p>\n<\/div>\n<\/div>\n<div id=\"conclusion\" class=\"article-section article-conclusion\">\n<div class=\"article-conclusion__heading\">\n<p class=\"article-kicker\">Conclusion<\/p>\n<h2>The quality of the source data determines the result<\/h2>\n<\/div>\n<p>Project preparation for BIM coordination is a consistent and clear principle:<\/p>\n<ol class=\"readiness-principle\" aria-label=\"Project readiness principle\">\n<li><strong>Current models<\/strong><\/li>\n<li><strong>Unique coordinates<\/strong><\/li>\n<li><strong>Designated responsible <\/strong><\/li>\n<li><strong>Exchange rules<\/strong><\/li>\n<li><strong>BEP and CDE<\/strong><\/li>\n<li><strong>Coordination cycle<\/strong><\/li>\n<\/ol>\n<p>The better the raw data is prepared, the more effectively the BIM team can focus on finding and resolving real engineering conflicts before construction begins.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A step-by-step checklist for architects, engineers, design bureaus and developers before starting coordination.<\/p>\n","protected":false},"author":2,"featured_media":147,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32],"tags":[],"class_list":["post-266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technical-bim-guides"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How to prepare a BIM project for coordination | Ziggurat<\/title>\n<meta name=\"description\" content=\"How to prepare a BIM project for coordination: standards, structure of models and checking of conflicts before the start of work. A practical checklist from Ziggurat.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How to prepare a BIM project for coordination | Ziggurat\" \/>\n<meta property=\"og:description\" content=\"How to prepare a BIM project for coordination: standards, structure of models and checking of conflicts before the start of work. A practical checklist from Ziggurat.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/\" \/>\n<meta property=\"og:site_name\" content=\"Ziggurat Coordination\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-11T07:20:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T12:11:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/bim-coordination-blueprint-hero.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1577\" \/>\n\t<meta property=\"og:image:height\" content=\"997\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"developer\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"developer\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/\"},\"author\":{\"name\":\"developer\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#\\\/schema\\\/person\\\/5ed9560450dac153ad75f0eb2cb8d925\"},\"headline\":\"How to prepare a project for BIM coordination\",\"datePublished\":\"2026-09-11T07:20:43+00:00\",\"dateModified\":\"2026-10-20T12:11:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/\"},\"wordCount\":583,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zigguratbim.co.il\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/bim-coordination-blueprint-hero.webp\",\"articleSection\":[\"Technical BIM guides\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/\",\"url\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/\",\"name\":\"How to prepare a BIM project for coordination | Ziggurat\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zigguratbim.co.il\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/bim-coordination-blueprint-hero.webp\",\"datePublished\":\"2026-09-11T07:20:43+00:00\",\"dateModified\":\"2026-10-20T12:11:57+00:00\",\"description\":\"How to prepare a BIM project for coordination: standards, structure of models and checking of conflicts before the start of work. A practical checklist from Ziggurat.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zigguratbim.co.il\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/bim-coordination-blueprint-hero.webp\",\"contentUrl\":\"https:\\\/\\\/zigguratbim.co.il\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/bim-coordination-blueprint-hero.webp\",\"width\":1577,\"height\":997,\"caption\":\"Dark blue coordination drawing of engineering systems with collisions marked\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/how-to-prepare-a-project-for-bim-coordination\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u0413\u043e\u043b\u043e\u0432\u043d\u0430\",\"item\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How to prepare a project for BIM coordination\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/\",\"name\":\"Ziggurat Coordination\",\"description\":\"\u041a\u043e\u043e\u0440\u0434\u0438\u043d\u0430\u0446\u0456\u044f \u0456\u043d\u0436\u0435\u043d\u0435\u0440\u043d\u0438\u0445 \u0441\u0438\u0441\u0442\u0435\u043c \u0456 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f BIM-\u043c\u043e\u0434\u0435\u043b\u044f\u043c\u0438\",\"publisher\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#organization\",\"name\":\"Ziggurat Coordination\",\"url\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/zigguratbim.co.il\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/logo.svg\",\"contentUrl\":\"https:\\\/\\\/zigguratbim.co.il\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/logo.svg\",\"width\":1,\"height\":1,\"caption\":\"Ziggurat Coordination\"},\"image\":{\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/#\\\/schema\\\/person\\\/5ed9560450dac153ad75f0eb2cb8d925\",\"name\":\"developer\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a4bbcf75d5635ce46c23b639877338fd45da54d57806753cb80775e81821347f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a4bbcf75d5635ce46c23b639877338fd45da54d57806753cb80775e81821347f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/a4bbcf75d5635ce46c23b639877338fd45da54d57806753cb80775e81821347f?s=96&d=mm&r=g\",\"caption\":\"developer\"},\"url\":\"https:\\\/\\\/zigguratbim.co.il\\\/en\\\/blog\\\/author\\\/developer\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How to prepare a BIM project for coordination | Ziggurat","description":"How to prepare a BIM project for coordination: standards, structure of models and checking of conflicts before the start of work. A practical checklist from Ziggurat.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/","og_locale":"en_US","og_type":"article","og_title":"How to prepare a BIM project for coordination | Ziggurat","og_description":"How to prepare a BIM project for coordination: standards, structure of models and checking of conflicts before the start of work. A practical checklist from Ziggurat.","og_url":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/","og_site_name":"Ziggurat Coordination","article_published_time":"2026-09-11T07:20:43+00:00","article_modified_time":"2026-10-20T12:11:57+00:00","og_image":[{"width":1577,"height":997,"url":"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/bim-coordination-blueprint-hero.webp","type":"image\/webp"}],"author":"developer","twitter_card":"summary_large_image","twitter_misc":{"Written by":"developer","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#article","isPartOf":{"@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/"},"author":{"name":"developer","@id":"https:\/\/zigguratbim.co.il\/en\/#\/schema\/person\/5ed9560450dac153ad75f0eb2cb8d925"},"headline":"How to prepare a project for BIM coordination","datePublished":"2026-09-11T07:20:43+00:00","dateModified":"2026-10-20T12:11:57+00:00","mainEntityOfPage":{"@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/"},"wordCount":583,"commentCount":0,"publisher":{"@id":"https:\/\/zigguratbim.co.il\/en\/#organization"},"image":{"@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#primaryimage"},"thumbnailUrl":"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/bim-coordination-blueprint-hero.webp","articleSection":["Technical BIM guides"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/","url":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/","name":"How to prepare a BIM project for coordination | Ziggurat","isPartOf":{"@id":"https:\/\/zigguratbim.co.il\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#primaryimage"},"image":{"@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#primaryimage"},"thumbnailUrl":"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/bim-coordination-blueprint-hero.webp","datePublished":"2026-09-11T07:20:43+00:00","dateModified":"2026-10-20T12:11:57+00:00","description":"How to prepare a BIM project for coordination: standards, structure of models and checking of conflicts before the start of work. A practical checklist from Ziggurat.","breadcrumb":{"@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#primaryimage","url":"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/bim-coordination-blueprint-hero.webp","contentUrl":"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/bim-coordination-blueprint-hero.webp","width":1577,"height":997,"caption":"Dark blue coordination drawing of engineering systems with collisions marked"},{"@type":"BreadcrumbList","@id":"https:\/\/zigguratbim.co.il\/en\/blog\/how-to-prepare-a-project-for-bim-coordination\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u0413\u043e\u043b\u043e\u0432\u043d\u0430","item":"https:\/\/zigguratbim.co.il\/en\/"},{"@type":"ListItem","position":2,"name":"How to prepare a project for BIM coordination"}]},{"@type":"WebSite","@id":"https:\/\/zigguratbim.co.il\/en\/#website","url":"https:\/\/zigguratbim.co.il\/en\/","name":"Ziggurat Coordination","description":"\u041a\u043e\u043e\u0440\u0434\u0438\u043d\u0430\u0446\u0456\u044f \u0456\u043d\u0436\u0435\u043d\u0435\u0440\u043d\u0438\u0445 \u0441\u0438\u0441\u0442\u0435\u043c \u0456 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f BIM-\u043c\u043e\u0434\u0435\u043b\u044f\u043c\u0438","publisher":{"@id":"https:\/\/zigguratbim.co.il\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zigguratbim.co.il\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/zigguratbim.co.il\/en\/#organization","name":"Ziggurat Coordination","url":"https:\/\/zigguratbim.co.il\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/zigguratbim.co.il\/en\/#\/schema\/logo\/image\/","url":"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/logo.svg","contentUrl":"https:\/\/zigguratbim.co.il\/wp-content\/uploads\/2026\/10\/logo.svg","width":1,"height":1,"caption":"Ziggurat Coordination"},"image":{"@id":"https:\/\/zigguratbim.co.il\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/zigguratbim.co.il\/en\/#\/schema\/person\/5ed9560450dac153ad75f0eb2cb8d925","name":"developer","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/a4bbcf75d5635ce46c23b639877338fd45da54d57806753cb80775e81821347f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/a4bbcf75d5635ce46c23b639877338fd45da54d57806753cb80775e81821347f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/a4bbcf75d5635ce46c23b639877338fd45da54d57806753cb80775e81821347f?s=96&d=mm&r=g","caption":"developer"},"url":"https:\/\/zigguratbim.co.il\/en\/blog\/author\/developer\/"}]}},"_links":{"self":[{"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/posts\/266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/comments?post=266"}],"version-history":[{"count":0,"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/posts\/266\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/media\/147"}],"wp:attachment":[{"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/media?parent=266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/categories?post=266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zigguratbim.co.il\/en\/wp-json\/wp\/v2\/tags?post=266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}