Infrastructure BIM

BIM coordination and management of BIM models for infrastructure objects

System BIM coordination for bridges, roads, tunnels, railways, stations, airports, ports and other transport and civil infrastructure facilities.

For infrastructure, it is not enough to simply combine models. Long linear geometry, a single coordinate system, structures, existing and new networks, process systems, temporary works, construction phasing and data that are subsequently transferred to the operations team need to be agreed upon.

Discuss the infrastructure project
  • 20+ years of experience
  • 1,000+ coordinated projects
  • Revit and AutoCAD
  • ISO 19650

Features of the infrastructure

What makes BIM coordination of infrastructure projects special

Learn more about our approach

The main difference of the infrastructure project is the scale and number of interfaces. One corridor can simultaneously include a road or track, bridges, tunnels, underground networks, drainage, stations, technical structures and areas designed by different teams.

The biggest problems arise not only because of geometric collisions. Different coordinate systems, incorrect elevations, outdated data on existing networks, incompatible boundaries of contract packages, route changes, unaccounted for temporary structures and lack of uniform model exchange rules become critical.

Key rules need to be fixed before active coordination: coordinate system, division of the object into zones and plots, limits of responsibility, format of models, update rules, status of output data and list of information for construction and operation.

BIM coordination of infrastructure is the control of space, geographic reference, engineering solutions and information throughout the project.

Critical nodes

Where complex coordination nodes occur most often

A binding error can displace an entire contract package

In large infrastructure projects, models from different disciplines and contractors must work in one geodetic system. Even a small error in a base point, a turn or an elevation mark can create dozens of pseudo-collisions or, on the contrary, hide a real conflict.

Before starting coordination, it is necessary to fix the coordinate system, control points, height system and rules for transferring models between teams.

Концептуальна ілюстрація єдиної системи координат і геодезичної основи транспортного коридору
Conceptual illustration · coordinate and geodesic base

The riskiest model is one that is trusted more than its source data

On roads, railways, stations and urban infrastructure projects, the actual position of existing networks often differs from the old documentation. Cables, water, sewer, gas, communication and drainage may have incomplete or inaccurate coordinates.

In a BIM environment, it is important not only to show the network, but also to understand the source and reliability of its data. Critical intersections need to be confirmed by survey, geodesy or additional field data before issuing construction decisions.

Концептуальна ілюстрація існуючих підземних мереж під дорогою та залізницею
Conceptual illustration · existing underground networks

In a linear infrastructure, the route must operate continuously

For roads, tunnels, platforms, drainage and gravity networks, it is not enough for the element to simply pass between other systems. It must maintain the required slope, marks and connection points along its entire length.

Locally, the pipe may not have collisions, but after bypassing the structure, lose the slope or form a low point. Such problems are detected only when checking the complete route, and not a separate fragment.

Концептуальна ілюстрація висотних відміток, ухилів і водовідведення вздовж транспортного коридору
Conceptual illustration · marks, slopes and drainage

The most difficult problems often arise precisely at the intersection of responsibility

A bridge can be designed by one team, approaches by another, external networks by a third, and station systems by a fourth. Each individual model may be correct, but there are inconsistencies in markings, holes, traces and connection points at the border of the packages.

Such interfaces should be allocated as separate coordination areas with a designated person in charge, a deadline for closing the issue, and controlled re-checking after changes.

Концептуальна ілюстрація меж між контрактними пакетами, ділянками та інженерними мережами
Conceptual illustration · boundaries of contract packages and plots

Free space is as much a part of the model as a structure or pipe

In tunnels, on railways, bridges and stations, it is necessary to keep the dimensions of rolling stock, vehicles, passages, evacuation routes and service access.

BIM coordination must check not only the solid geometry of the elements, but also the areas that must remain free during operation and maintenance.

Концептуальна ілюстрація габаритів руху, сервісного доступу та евакуаційних маршрутів
Conceptual illustration · dimensions of movement and access

Conflict can only exist during construction

Cranes, temporary supports, installation sites, detours, traffic closures, temporary drainage and relocated networks are often missing from the final model, but they determine the feasibility of the work.

For complex areas, it is useful to check the model together with the calendar sequence: where the equipment will be located, when the area is vacated, which route remains available and whether parallel operations are blocking each other.

Концептуальна ілюстрація тимчасових робіт, організації руху та поетапного будівництва мосту
Conceptual illustration · temporary works and phasing

At the infrastructure object, not only the structure is transferred, but also a large number of assets

A station, tunnel or transport hub contains thousands of components: shields, fans, pumps, valves, sensors, cables, lights, doors, fire equipment and other assets.

If the rules for naming, classifying and filling attributes are not defined at the beginning, at the end of the project you have to manually restore the connection between models, drawings, passports and actual equipment.

Концептуальна ілюстрація даних для експлуатації транспортної станції та її інженерних активів
Conceptual illustration · operating data

01 / Bridges and structures

BIM coordination of bridges and transport structures

In bridges and overpasses, the main coordination task is to relate the track geometry to the actual structure and elements that are manufactured or assembled with high precision.

It is important not to lose the geometric connection between the calculation model, the structural BIM model, the working documentation and the data transmitted to the manufacturer. An error at this transition may appear already during steel fabrication or installation.

Critically check
  • Supports, crossbars and span structures
  • Markings of supporting parts and deformation seams
  • Drainage and cable channels
  • Fittings, holes and fasteners
  • Barriers, fencing and lighting
  • Junctions of the bridge with the road or track
  • Assembly areas and heavy equipment access

02 / Roads and corridors

BIM coordination of roads and linear infrastructure

For roads and transport corridors, coordination begins with the correct axis, longitudinal profile and digital terrain model.

All disciplines must work with one relevant geodetic framework. Otherwise, the models may look coordinated locally, but not match when brought to life.

Then they are checked
  • Horizontal and vertical tracing
  • Transverse profiles and earthworks
  • Drainage, culverts and ditches
  • Existing and new underground networks
  • Retaining walls, slopes and noise protection
  • Bridges and other artificial structures
  • Temporary detours and organization of construction

03 / Tunnels

BIM coordination of tunnels and underground infrastructure

The tunnel is a long technical corridor with a strictly limited transverse profile. Structures, track or carriageway, ventilation, fire protection, drainage, electricity, communication, automation and evacuation infrastructure must be coordinated on a kilometer length.

In Gilon Railway Tunnels Ziggurat operated with two parallel railway tunnels of approximately 4.6–4.7 km and 18 emergency crossings. Here you need to control the continuity of routes, repeated nodes, access and interaction of systems along the entire facility.

Especially complex knots
  • Portals and transitions to the underground part
  • Transverse emergency crossings
  • Ventilation and evacuation shafts
  • Pumping and low drainage points
  • Technical chambers and electrical rooms
  • Changes in markings or curvature of the track
  • Concentrations of fire and communication systems

04 / Railways and stations

BIM coordination of railways, metro and stations

In railway projects, track geometry is the basis against which platforms, structures, engineering systems and equipment are coordinated.

Ziggurat's portfolio includes the Dayan Center Railway Station and the West Yavne Railway Station for Israel Railways, as well as the NETA Urban Transportation Control Center in Tel Aviv. This experience combines transportation geometry, building structures and engineering systems in one environment.

In the focus of coordination
  • The dimensions of the rolling stock and the edge of the platform
  • Vertical communications and barrier-free routes
  • Drainage and pumping systems
  • Power supply, communication and signaling
  • Ventilation and smoke protection
  • Fire and evacuation routes
  • The interface of the line and the station building
  • Works next to the existing railway

05 / Terminals

BIM coordination of airports, ports and transport terminals

An airport or a large transport terminal combines a building, a technological complex and a continuous operational activity. Baggage or cargo equipment, access systems, telecommunications, vertical transport, specialized service areas and external transport infrastructure are added to standard engineering systems.

BIM management is especially important here: several work packages can simultaneously change one area, so the team must know exactly which model is relevant and which changes have been agreed upon.

Key risks
  • Intersections of technological systems with MEP and structures
  • Large air ducts and cable routes
  • Service access to equipment
  • Routes of passengers, personnel and cargo
  • Staged reconstruction of the operating terminal
  • Temporary systems switching schemes
  • Communication with the platform, roads and external networks

Interdisciplinary model

What systems interact in infrastructure projects

01 / Base

Geometry and raw data

  • Route and longitudinal profile
  • Relief and geodetic basis
  • Coordinate system
  • Existing networks
  • Boundaries of plots and contract packages
02 / Buildings

Constructions

  • Bridges and overpasses
  • Tunnels, portals and mines
  • Support structures
  • Platforms and station structures
  • Holes, sockets and fasteners
03 / Engineering

Engineering and technological systems

  • Drainage and pumping
  • Ventilation and smoke protection
  • Electricity supply and lighting
  • Fire protection
  • Communication and telecommunications
  • Alarms and control systems
  • Transport and terminal equipment
04 / Life cycle

Coordination and operation

  • Movement dimensions
  • Service and evacuation zones
  • Temporary works
  • Phased construction
  • Asset data
  • Transfer of information to the operator

In Infrastructure BIM, it is important to ensure not only the absence of collisions, but also spatial continuity, accurate georeferencing, control of interfaces, real construction sequence and data manageability along the entire length of the object.

BIM Management

Management of BIM models in infrastructure projects

In a large-scale infrastructure, the main risk is often not the lack of information, but the fact that different teams are working with different versions of it.

For large stations and transport nodes, the number of assets can be measured in the tens of thousands. If data on equipment, installation location, documentation and status are not structured during design and construction, handing over to the operator becomes a separate major information cleanup project.

Model and change management
  1. 01 A single system of coordinates and georeferences
  2. 02 Division of the model by areas, zones or picketing
  3. 03 Consistent file, system, and asset names
  4. 04 Limits of liability between contracts
  5. 05 Control of versions and statuses of models
  6. 06 Shared data environment
  7. 07 Journal of coordination issues and decisions
  8. 08 Exchange rules between BIM, CAD and GIS
  9. 09 Data structure for future exploitation

Practical principles

What reduces the risks on the infrastructure project

01 / Geodesy

Fix the coordinate system

Base geodesy, control points, elevation system and export rules must be agreed upon before the first merged model. It's cheaper than having to fix the biased models of all disciplines later.

02 / Interfaces

Highlight joints as separate tasks

Junctions "tunnel-station", "bridge-road", "track-platform", "building-external networks" and contract boundaries should have their own checks and responsible.

03 / Data quality

Separate facts from assumptions

An existing network from an old drawing cannot be perceived in the same way as a network confirmed by geodesy. The model should be clear about which data can be trusted.

04 / Construction

Check the montage, not just the ending

For bridges, stations, tunnels and reconstruction of existing infrastructure, temporary structures, machinery, detours, phased switches and access to the work area must be considered.

05 / Operation

Prepare the model for handover to the operator

Asset IDs, classification, system names, and required attributes are best defined prior to mass populating models. Then the operator will receive structured information, and not a set of incompatible files.

Ziggurat experience in transport infrastructure

Ziggurat's portfolio includes Gilon Railway Tunnels, Dayan Center Railway Station, West Yavne Railway Station and NETA Urban Transportation Control Center. These types of facilities include long engineering routes, complex transportation nodes, limited technical spaces, and coordination of many systems.

Ziggurat services

Related BIM services

01 / Service

Systems Coordination

Interdisciplinary coordination of geometry, structures, engineering and transport systems with conflict analysis, feasibility testing and development of technically agreed solutions.

View the service
02 / Service

BIM Management

Control of models, versions, coordinates, asset data, common data environment and information processes between the participants of the infrastructure project.

View the service

Directions of Infrastructure BIM

Different scales - Unit logic of coordination

01 / Road BIM

BIM for roads and transport corridors

Coordination of the route, terrain, drainage, existing networks, artificial structures and phased construction.

02 / Bridge BIM

BIM for bridges

Coordination of span structures, supports, joints, drainage, embedded parts and data for manufacturing and installation.

03 / Rail BIM

BIM for railways, metros and stations

Coordination of track, platforms, structures, engineering systems, signaling, communication and station infrastructure.

04 / Tunnel BIM

BIM for tunnels and underground civil structures

Coordination of tunnel geometry, ventilation, drainage, fire, electrical, communication and evacuation systems.

05 / Terminal BIM

BIM for airports, ports and transport terminals

Coordination of engineering and technological systems, passenger or cargo areas, external infrastructure and phased reconstruction.

Military and defense objects are presented in a separate branch - "Military and defense objects" .

Your infrastructure project

Need BIM coordination infrastructure project?

If you are working on a bridge, road, tunnel, railway, station, airport, port or other transport infrastructure object, send us the existing project materials.

We will assess geometry, structures, engineering systems, package boundaries, output quality and information requirements and determine the required scope of BIM coordination and BIM model management.

Discuss the infrastructure project

FAQ

Frequently asked questions about BIM coordination infrastructure objects

In the infrastructure, it is necessary to control long distances, georeferencing, gradients, existing networks, traffic dimensions, contract boundaries and phasing of construction. A locally correct model may be incorrectly integrated into the overall corridor.

A single coordinate system, geodetic basis, division of the project into zones responsible for interfaces, rules for exchanging models, status of initial data and requirements for final information.

The model allows you to combine new solutions with the actual state, check temporary schemes, phased switching, equipment access and interaction with networks and structures that remain in operation.

It is necessary to check the continuity of systems on a long length, traffic dimensions, drainage, ventilation, fire protection, emergency transitions and service access.

Due to the large number of models, contracts and changes. Without version control, coordinates, and statuses, even a well-modeled system can be coordinated with out-of-date data.

For large objects, this is often appropriate: BIM provides detailed geometry and technical information, while GIS helps to work with spatial context, parcels, networks and geographically distributed assets.

When the baseline, structural and engineering solutions are sufficiently established for verification, but key joints, networks, openings, equipment and building packages can still be changed without expensive impact on fabrication and installation.