BIM coordination and management of BIM models services for construction projects of various complexity

We provide BIM coordination, management of BIM models and information processes in accordance with the BIM Execution Plan (BEP) and the international standard ISO 19650, helping to eliminate conflicts, minimize risks and prepare the project for construction.

Our projects
  • Coordination in Revit & AutoCAD
  • All branches of construction
  • $1 in BIM coordination = $5 in construction savings
01

Precision under the guidance of experts

Each BIM process is led by experienced specialists with 20+ years of experience in complex international projects, ensuring seamless coordination of architecture, structures and engineering systems.

02

Maximum efficiency thanks to a single integrated coordination model — Shadow Model

We integrate the models of all project participants into a single coordination environment (Shadow Model), which provides full visibility of engineering systems, accurate detection of collisions, and the adoption of sound engineering decisions.

03

High quality and compliance with BIM standards

We ensure stable project quality through standardized work processes defined in the BEP (BIM Execution Plan) and a controlled cloud environment (ACC / BIM 360). Models are developed at LOD 300-450, providing the necessary level of detail for accurate coordination, collision detection, and build-ready results.

Service

What is included in BIM coordination and BIM model management services?

Service 01

Systems Coordination

The service includes:

  • Comprehensive inspection of drawings
  • Analysis based on Shadow Model
  • Engineering solution of collisions taking into account:
    • engineering precision
    • operational efficiency
    • operability
  • Interdisciplinary coordination: MEP, architecture and structures
  • Three coordination cycles — 2-3 weeks per floor
  • Coordination results:
    • Federated BIM model
    • Drawings, plans and sections
    • hole drawing
    • conflict reports and resolutions
Result

A fully agreed, tested and ready-to-build model with no conflicts.

More details
Service 02

BIM Management

The service includes:

  • Creation and management of BIM environment (ACC / BIM 360)
  • Setting accesses, roles and data structure
  • Development and implementation of BIM Execution Plan
  • BIM-standards and quality control (QA/QC)
  • Data-driven control and status reports:
    • collision tracking
    • progress control
    • Detection of delays
  • The only source of data
Result

A controlled and transparent process where all participants work according to uniform standards without losing data and versions.

More details

Advantages

Advantages of BIM coordination and management of BIM models

01

Engineering solutions, not just collision detection

We don't just identify problems — we develop optimized routing and coordination solutions based on real-world construction conditions.

Every collision is resolved.

02

Reducing rework and protecting the budget

Early coordination prevents overlapping systems and installation conflicts. Using and updating the model improves project management throughout the object's lifecycle.

Up to 25-40% less rework.

03

Faster project coordination and implementation

Structured BIM processes eliminate delays in approvals and decision-making.

The coordination cycle of one floor is 2-3 weeks.

04

Convenient process management and progress tracking

All participants work in a single BIM model (ACC / BIM 360) with full transparency.

No outdated blueprints.

Created for complex projects

The solution is designed for medical institutions, data centers, industrial facilities and complex high-rise buildings. The more complex the project, the greater the effect.

Coordination process

How does our system coordination and 3D model management process work?

  1. 01

    Preparation of data and models

  2. 02

    Integration of models

  3. 03

    Analysis and detection of collisions through the Shadow Model

  4. 04

    Engineering coordination and solutions

  5. 05

    Reporting and final coordinated results

Get an estimate

Need BIM coordination and 3D model management for a project?

Get a detailed calculation and consultation

Answers to questions

Frequently asked questions about BIM coordination

  • In most cases, the price is formed per m² or as a fixed cost per project. For complex objects, it is usually $2-$25 per m², depending on the scope of work and the detail of the output data.

    The main value of BIM coordination is savings: it allows you to reduce rework up to 30% and save up to $5 on construction for every $1 of investment.

    We prepare a detailed calculation after analyzing your drawings (DWG, PDF, IFC, RVT).

  • Our BIM coordination services cover the full cycle of coordination of all sections of the project in a single 3D model.

    The services include:

    • detection of collisions between all systems;
    • coordination of engineering systems (HVAC, electricity, plumbing);
    • Coordination of architecture and structures;
    • Availability Check - Trace and Service Access;
    • coordinating meetings and control of comments;
    • coordinating drawings;
    • drawing of holes and penetrations;
    • final coordinated BIM model for construction and tendering.

    We ensure complete system coordination before the start of construction.

  • BIM-coordination is most effective on complex multifunctional projects where a large number of systems intersect.

    Especially relevant for:

    • multi-storey residential and mixed-use complexes;
    • hospitals and medical centers;
    • data centers and industrial facilities;
    • commercial and infrastructure projects;
    • objects with underground parking and complex engineering networks.

    The more complex the project, the greater the benefit from BIM coordination.

  • Creating your own BIM department requires significant investments: finding and hiring specialists, their training, purchasing software, organizing work processes, and maintaining a permanent team.

    Instead, you can engage an experienced BIM partner and get a ready-made team of specialists exactly when you need them. We work as an external BIM team for developers, design offices and general contractors, providing a full cycle of BIM coordination and model management.

    Our team includes BIM managers, BIM coordinators and professional engineers with 15-20 years of experience in implementing complex construction projects.

    We integrate into your work processes and provide:

    • setting up a unified cloud environment (Autodesk Construction Cloud / BIM 360);
    • coordination of all project participants;
    • control of model versions and compliance with BIM standards;
    • regular collision detection and processing;
    • constant support of the team during the entire design stage.

    As a result, you get a full-fledged BIM team without the costs of internal recruitment, training and retention of personnel, as well as access to proven processes and years of expertise.

  • BIM coordination is the process of combining all project models (architecture, construction, engineering) into a single 3D model to identify and eliminate conflicts before construction begins.

    The process includes:

    1. Combination of models
    2. Collision detection
    3. Reconciliation and control of remarks
    4. Update models
    5. Transfer of final coordinated model

    This guarantees the correct implementation of the project without conflicts on the site.